Performance Solution

Part A2 of the National Construction Code ("NCC") provides a framework for methods of demonstrating compliance with the NCC. Compliance with the NCC is achieved by complying with—

  1. the Governing Requirements of the NCC; and
  2. the Performance Requirements.

Performance Requirements are satisfied by one of the following, as shown in Figure 1:

  1. A Performance Solution.
  2. A Deemed-to-Satisfy Solution.
  3. A combination of (1) and (2) above.

A Performance Solution is achieved by demonstrating—

  1. compliance with all relevant Performance Requirements; or
  2. the solution is at least equivalent to the Deemed-to-Satisfy Provisions.

Disclaimer

In preparing this definition, we have drawn from various sources including Legislation, Codes, Standards and industry information, research and knowledge.  Like the english language, these definitions may subtly change from time to time. As such these definitions are provided solely on the basis that users will be responsible for making their own assessment of the definition and and are advised to verify all relevant representations, statements and information.